e-WV: The West Virginia Encyclopedia Online

Appalachian Corridor Highways

Sign in or create a free account to curate your search content.

Development of West Virginia's Appalachian Corridor highways began in 1965, when U.S. Sen. Jennings Randolph helped to create the Appalachian Regional Commission. The Appalachian Development Highway System was created under the Appalachian Regional Commission to attract industry and diversify the economic base by building good roads throughout the previously isolated region. Originally including 23 individual corridors designated alphabetically from A to W, the 3,285-mile system was designed to link the Interstate highways of the 13 Appalachian states. West Virginia's 424-mile system included six routes, designated D, E, G, H, L, and Q.

Corridor D (U.S. 50) was designated as an 82-mile four-lane highway from Ohio to I-77 at Parkersburg and on to I-79 at Clarksburg. Seventy-two miles of the highway were built from Parkersburg to Clarksburg by the late 1970s. After sufficient funding was secured, a bridge over the Ohio was completed and opened to traffic June 13, 2008. The bridge spans historic Blennerhassett Island though there is no access to the island from the highway. The bridge completed construction of Corridor D.

Corridor E, completed in the late 1970s as U.S. 48 and redesignated in 1992 as Interstate 68, is a 32-mile link from I-79 near Morgantown eastward to I-70 near Hancock, Maryland.

Corridor G (U.S. 119) is a 79-mile route linking Kentucky near Williamson with I-64 at Charleston. Corridor G is also known as the Robert C. Byrd Freeway, because Byrd helped to secure a major part of the funding for it and other corridors. West Virginia’s portion of the highway was complete by the 1990s.

Corridor H is the only corridor highway that remains incomplete. It begins at I-79 at Weston and will end Strasburg, Virginia, at Interstate 81 when complete. The building of Corridor H was controversial, arousing strong passions for and against. Decades of public debate and legal battles aired the essential question of whether previously isolated areas should be preserved or opened to development. Despite the controversy, about 75 percent of the highway had been completed as of 2018. The highway is open from the Weston exit of I-79 to Kerens, Randolph County, a distance of about 41 miles. A segment of approximately 66 miles from Davis to Wardensville in Hardy County is also open to traffic. The segment from Kerens to Davis is either under design or under construction as of January 2019. The segment from Wardensville to the Virginia state line is not expected to begin construction until 2027.

Corridor L (U.S. 19) is a 70-mile link between I-77 near Beckley and I-79 near Sutton. Including the spectacular New River Gorge Bridge, the road was completed in the 1970s with four lanes only from U.S. 60 south. Continuing increases in traffic resulted in upgrading the remainder to four lanes, with the final segments from Summersville northward completed at the end of the 1990s.

Corridor Q (U.S. 460), a 27-mile route through Mercer County completed in the 1970s, connects via the Virginia portion of U.S. 460 to I-81.

Visit the Division of Highways website dedicated to Corridor H

— Authored by Carol Melling

Related Articles

Cite This Article

Melling, Carol. "Appalachian Corridor Highways." e-WV: The West Virginia Encyclopedia. 08 February 2024. Web. Accessed: 21 November 2024.

08 Feb 2024